14-day free trial on every product. Get Started · Book a demo
Case Study · Composite Scenario

Auto repair — multi-bay mechanical workshop · Nairobi, Kenya

Multi-Bay Garage Cuts Intake Disputes And Payment Delays

A six-bay Nairobi workshop replaced paper job cards and manual M-Pesa tracking with Garage OS. Within 60 days the team reported fewer customer disputes, faster vehicle release, and cleaner month-end reconciliation.

Outcomes below reflect common patterns from Kenyan customer rollouts — representative composite scenario, not a single named client.

The Challenge

Peak-hour intake created queues while advisors retyped vehicle details. M-Pesa payments arrived without invoice references, delaying handovers. Insurance jobs needed photo evidence scattered across WhatsApp threads.

The Approach

  • Rolled out digital intake with mandatory four-corner photos on every job
  • Linked M-Pesa and till payments directly to invoices before release
  • Standardised insurance estimate templates with evidence attached to the job thread
  • Gave technicians mobile task queues instead of verbal instructions

Reported Outcomes

Intake-to-job-card time

Before: ~12 minutes paper flow

After: ~4 minutes digital intake

Payment mismatch disputes

Before: Weekly front-desk escalations

After: Near-zero after 45 days

Vehicle release delay after job complete

Before: Often 30–90 minutes

After: Under 15 minutes median

Month-end payment reconciliation

Before: 2–3 days manual

After: Same-day export

We stopped arguing about scratches and started arguing about which bay gets the next performance job — because the system shows us the truth.

Workshop owner — Nairobi multi-bay operator (composite scenario)

Product featured

Garage OS